BIDFINDER

Solicitation · 19JM3727Q0002

Trenching, Conduit and Ground-well Installation

Department of State

Agency
Department of State FederalU.S. Embassy Kingston
Offers due
November 25, 2026, 2:00 PM (ET) closes in 16 days
Estimated value
not stated
Notice type
Solicitation
Category
Construction
NAICS code
238910 Site Preparation Contractors
Product service code (PSC)
N038
Posted
October 28, 2026
Solicitation number
19JM3727Q0002
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Construction, nationwide

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

Description The United Stated Embassy in Kingston is requesting proposals for Trenching, Conduit And Ground-Well Installation in various locations on the Embassy compound. The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding. Trenching from Handholes The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings. Conduit Existing conduit shall remain in place unless the drawings specifically direct removal or modification. Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater. All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends. Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers. The Contractor shall install pull lines in all new conduit runs. Soil and Backfill Materials Soil Materials The Contractor shall provide all labor and materials for soil and backfill, where required. Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter. Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve. Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand. Placement and Compaction Place backfill and fill in layers not exceeding: 8 inches (203 mm) loose thickness for heavy compaction equipment; 4 inches (102 mm) loose thickness when compacted by hand-operated tampers. Place backfill and fill evenly to the required elevations, uniformly along their full length. Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557: Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%. Utility trenches: compact each layer of initial and final backfill to 85%. Anticipated Period of Performance: a base period of twenty-one (21) days after contract award Eligibility and Registration Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award. Local Insurance and Defense Based Act (DBA) Insurance. A site visit has been scheduled for Friday, November 06, 2026 at 10 a.m. Offeror interested in attending must email [email removed] with the caption 'TRENCHING - SITE VISIT'. To ensure access you are required to be approved prior to the visit. You are to provide the full names of the attendees, the vehicle information to include make, model, color and plate number of the vehicle being driven. The email must be sent no later than Wednesday, November 04, 2026 by 2 pm. Completed proposal are to be email to [email removed] in PDF format by the deadline stipulated.

Browse more bids

More open bids from this agency

Similar open bids