BIDFINDER

Award Notice · N5523626R0009

USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Department of the Navy · San Diego, CA

This is a notice (Award Notice), not a request for offers.

Agency
Department of the Navy FederalSouthwest Regional Maint Center
Place
San Diego, CA
Offers due
no due date given
Estimated value
$3,404,927
Notice type
Award Notice
Category
Vehicles and transport
NAICS code
333618 Other Engine Equipment Manufacturing
Product service code (PSC)
2815
Posted
November 4, 2026
Solicitation number
N5523626R0009
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Vehicles and transport in California

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.

Browse more bids

More open bids from this agency

Similar open bids