BIDFINDER

Solicitation · N0010426QXB91

LEAD,TEST,O2 Sensor

Department of the Navy · Mechanicsburg, PA

This bid no longer takes offers

Offers were due November 9, 2026, 3:30 PM. Open bids like it are listed below.

New bids by email: Furniture and equipment in Pennsylvania

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

More open bids from this agency

Similar open bids

Agency
Department of the Navy FederalNAVSUP Weapon Systems Support Mech
Place
Mechanicsburg, PA
Offers due
November 9, 2026, 3:30 PM (ET)
Estimated value
not stated
Notice type
Solicitation
Category
Furniture and equipment
NAICS code
334412 Bare Printed Circuit Board Manufacturing
Product service code (PSC)
6625
Posted
October 21, 2026
Solicitation number
N0010426QXB91
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

CONTACT INFORMATION|4|N774.3|BV5|[phone removed]|[email removed]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|120| GENERAL INFORMATION-FOB-DESTINATION|1|Destination | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)||To Be Determined|N00104|To Be Determined|To Be Determined|See Schedule|To Be Determined|See Schedule||To Be Determined|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS Mechanicsburg| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 days after contract award date | CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| A. Electronic submission of any quotes, representations, and any necessary certifications shall be accomplished via an email directed to [email removed]. B. General Requirements: MIL-STD Packaging, Government Source Inspection Required. C. FOB destination. Quotes shall include shipping costs for shipment of units to destination. D. This RFQ is for a BUY/Procurement. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. E. Only a Firm-Fixed Price (FFP) will be accepted. F. Must adhere to IUID requirements of DFARS [phone removed] G. The ultimate awardee of the proposed contract action must be an authorized source. Award of the proposed contract action will not be delayed while an unauthorized source seeks to obtain authorization. H. Your quote should include the following information for justification purposes: - New procurement unit price____________________ - Total Price _____________________ - Procurement delivery lead time (PTAT) _________________ days - Award to CAGE _______________ - Inspection & Acceptance CAGE, if not at Award to CAGE _____________ - Cost breakdown requested, including profit rate (if feasible). - Quote expiration date _______________ (90 Days minimum is requested). - Delivery Vehicle (If Delivery Order requested)(e.g. if your CAGE has a current BOA/IDIQ) I. Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide an official letter and/or email from the OEM confirming that your company is an authorized distributor of their items. I. Production Lot Testing applies for the requirement. The EOD Technician has 90 days in which to test/inspect/accept the production quantity. The contract administrator has an additional 30 days in which to notify the contractor of the results; total 120 days. ACCEPTANCE AT DESTINATION INSPECTION AT ORIGIN ACCEPTANCE AT DESTINATION EVALUATION FACTORS: Evaluation Utilizing Simplified Acquisition Procedures The Government will issue an order resulting from this Request for Quotation to the responsible offeror whose quotation results in the best value to the Government, considering both price and a non-price factors. The following factors will be used to evaluate quotations in order of relative importance: 1) Price. 2) Past Performance. The offeror's past performance on related contracts will be evaluated to determine the following as appropriate: successful performance of contract requirements, quality and timeliness of delivery of goods and services, cost management, communications between contracting parties, and customer satisfaction. 3) Supplier Performance Risk as described in DFARS [phone removed]. (End of provision) Quotes shall be received no later than the date specified in the solicitation in order to be considered. J. OPTIONS PROSPECTIVE OPTION QUANTITY UP TO 100% NOTES: The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the government requests up to a 100% (50 EA) option for a period of 365 days. The option grants the Government the unilateral authority to increase this order up to the above quantity within 365 days of the contract award date. This will incorporate FAR Clause 52.217-6 (Option for Increased Quantity) into the award. The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. A modification will be completed at the time the option is exercised and all current contract terms and conditions will apply to the option quantity. Please indicate if the Contracting Officer may exercise the 100% option quantity for the contract. Yes ____ or No ____ Or if you request a variation to the option please let me know in your quote. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the LEAD,TEST,O2 SENSOR . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=6195951 |53711| G| |C| | | | DRAWING DATA=6195952 |53711| F| |C| | | | DRAWING DATA=6915273 |53711| A| |C| | | | DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | DOCUMENT REF DATA=MIL-DTL-19595 | | |D |030211|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The LEAD,TEST,O2 SENSOR furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;53711 6915273; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Production Lot Approval (Government Testing) - Production Lot Test and approval is required. 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part ...

Browse more bids