BIDFINDER

Solicitation · N0010425QZB97

Valve,Regulating,FL, in Repair/Modification of

Department of the Navy · Mechanicsburg, PA

Agency
Department of the Navy FederalNAVSUP Weapon Systems Support Mech
Place
Mechanicsburg, PA
Offers due
November 20, 2026, 3:30 PM (ET) closes in 11 days
Estimated value
not stated
Notice type
Solicitation
Category
Maintenance and repair
NAICS code
332919 Other Metal Valve and Pipe Fitting Manufacturing
Product service code (PSC)
4820
Posted
October 22, 2026
Solicitation number
N0010425QZB97
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Maintenance and repair in Pennsylvania

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

CONTACT INFORMATION|4|N742.10|WV1BB|N/A|[email removed]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION/ACCEPTANCE POINT|6||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Material - Invoice and Receiving Report (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|N/A|N/A|N/A|N/A|N/A|[phone removed] - WAWF Helpdesk| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|TBD| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332911|750 (# of employees)|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| National Defense, Emergency Preparedness, and Energy Program Use. sk orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either in the mail, transmitted by facsimile, or sent by other electronic methods, such as email. The Government's acceptance of the contract proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. The following proposed delivery schedule applies: Final delivery of material shall be on or before 525 days after the effective date of the contract. 3. Any contract/order awarded as a result of this solicitation will be a "DO" rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). See FAR Clause 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use. 4. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 5. All transportation to/from the repair site will be paid for by the US Navy. 6. Offers shall be submitted as an estimated price for the full repair effort based on the repair instruction or SOW. The contractor shall have 30 days to complete a teardown and evaluation of the carcasses and submit a repair report and Firm-Fixed Price offer. A cost of new price shall also be provided in addition to the repair price. 7. Include in the estimated price all costs associated with receipt and complete repair of material that may be in unwhole condition, missing hardware, damaged, handling damage, missing parts, wear damage, and CAV reporting. Please include the following: a. Teardown and Evaluation Rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: 8. This requirement utilizes Government Furnished Property (GFP). Any GFP located at the contractor's facility in storage that can be used for repair of the requirement must be utilized and called out within the final quote. 9. The contractor shall comply with the Commercial Asset Visibility (CAV) of the asset(s) in this order in accordance with NAVSUPWSSFA24. 10. Repair Turn Around Time (RTAT) - the resultant contractual delivery requirement is measured from the asset return to the asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the contract. Requested RTAT: XXX Days Proposals shall reference the proposed RTAT and any capacity constraints. Price Reductions Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment will be implemented via a reconciliation modification at the end of contract performance. Price reductionsmade pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. Reconciliation A reconciliation modification will be issued after final inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall be applicable. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the VALVE,REGULATING,FL . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;V1E10411 99517 F B ; DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this Contract, including all testing and military specification requirements. 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Vacco Drawing V1E10411, ASSY V1E10411-01; , except as amplified or modified herein. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 Marking - This item must be physically identified in accordance with MIL-STD-130. 3.3 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For ...

Browse more bids

More open bids from this agency

Similar open bids