Solicitation · N0010427QYA48
Pilot Valve
Department of the Navy · Mechanicsburg, PA
- Agency
- Department of the Navy FederalNAVSUP Weapon Systems Support Mech
- Place
- Mechanicsburg, PA
- Offers due
- November 27, 2026, 3:30 PM (ET) closes in 18 days
- Estimated value
- not stated
- Notice type
- Solicitation
- Category
- Other goods
- Product service code (PSC)
- 4820
- Posted
- October 28, 2026
- Solicitation number
- N0010427QYA48
Opens the notice on SAM.gov, with its attachments and how to respond.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
Description
CONTACT INFORMATION|4|N741.6|GDHCC|N/A|TYREESE.SMITH| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|combo invoice and receiving report||TBD|N00104|TBD|TBD|W25G1U|94697|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| All freight is FOB Origin. The resultant award of this REPAIR solicitation will be issued bilaterally, requiring the contractors written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government Source Inspection (GSI) is required. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ PLEASE ATTACH INFORMAL COST BREAKDOWN, IF APPLICABLE:________ Repair Turnaround Time (RTAT): _______ days Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. This solicitation incorporates the option to utilize Additive Manufacturing (AM) for this requirement. Specifically, the solicitation incorporates local term WSSTERMHZ22 (HZ22LN) ADDITIVE MANUFACTURING INTERCHANGEABILITY in Section H and a Contract Data Requirements List (CDRL) requiring reporting the use of Additive Manufacturing to the Technical Data Package (TDP). The Government encourages the integration of AM solutions where feasible and advantageous. Offerors are permitted to incorporate AM methodologies into their initial proposal submission, provided it can be accomplished without jeopardizing established delivery or submittal milestones. Proposal submissions SHOULD NOT be delayed in order to include AM processes. Any prospective AM implementation may be submitted and evaluated post-award in accordance with the provisions established by this solicitation. Return Material Authorization # (RMA), if applicable:__________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________ \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PILOT VALVE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The PILOT VALVE repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;94697 196000-102; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Additive Manufacturing- If/When Additive Manufacturing election taken by vendor, to maintain visibilityover Additively Manufactured components within the supply chain, Contract Data Requirements List (CDRL) DD1423 reporting mechanisms apply. DD1423 requirements invoke Certification/Data Report, Process and Material Traceability to be submitted electronically to the NAVSUP HQ AM mailbox and WAWF; as described on 1423. DCMA QAR shall verify complete Master Traceability Ledger is compiled, accurate, and electronically transmitted to the NAVSUPHQAM and WAWF prior to signing the DD 250 / WAWF receiving report. See 1423. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the ...
Browse more bids
- All bids from Department of the Navy (Mechanicsburg, PA)1,506
- Federal other goods bids in Pennsylvania607
- Other goods: every open bid2,243
- Open bids under NAICS 332919 (Other Metal Valve and Pipe Fitting Manufacturing)267
- Open bids in Mechanicsburg, PA854
- Open bids in Pennsylvania1,884
- Bids closing in 7 days
More open bids from this agency
- closes in 23 days
- closes in 16 days
- closes in 3 days
- closes in 2 days
- closes in 7 days
Similar open bids
- closes in 36 days
- closes in 36 days
- closes in 38 days
- closes in 14 days
- closes in 25 days
- closes in 28 days
- closes in 7 days
- closes in 28 days
- closes tomorrow
- closes tomorrow