Solicitation · 6982AF27B000002
AZ BL COLO 7528(1) Burro Creek Road
Federal Highway Administration · Kingman, AZ
- Agency
- Federal Highway Administration Federal6982AF Central Federal Lands Divisi
- Place
- Kingman, AZ
- Offers due
- November 17, 2026, 4:00 PM (ET) closes in 8 days
- Estimated value
- not stated
- Notice type
- Solicitation
- Category
- Construction
- Product service code (PSC)
- Y1LB
- Set-aside
- Small Business Set Aside - Total
- Posted
- November 5, 2026
- Solicitation number
- 6982AF27B000002
Opens the notice on SAM.gov, with its attachments and how to respond.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
Description
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement - October 2026 Award-January - 2027 Construction - January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Browse more bids
- All bids from Federal Highway Administration (Kingman, AZ)58
- Federal construction bids in Arizona14
- Construction: every open bid461
- Open bids under NAICS 237310 (Highway, Street, and Bridge Construction)65
- Open Total Small Business set-aside bids2,847
- Open bids in Kingman, AZ4
- Open bids in Arizona57
- Bids closing in 7 days
More open bids from this agency
- closes in 11 days
- closes in 29 days
- closes in 8 days
- closes in 29 days
- closes in 3 days
Similar open bids
- closes in 14 days
- closes in 22 days
- closes in 24 days
- closes in 28 days
- closes in 22 days
- closes in 21 days
- closes in 9 days
- closes in 9 days
- closes in 8 days
- closes in 9 days