BIDFINDER

Solicitation · 6982AF27B000002

AZ BL COLO 7528(1) Burro Creek Road

Federal Highway Administration · Kingman, AZ

Agency
Federal Highway Administration Federal6982AF Central Federal Lands Divisi
Place
Kingman, AZ
Offers due
November 17, 2026, 4:00 PM (ET) closes in 8 days
Estimated value
not stated
Notice type
Solicitation
Category
Construction
NAICS code
237310 Highway, Street, and Bridge Construction
Product service code (PSC)
Y1LB
Set-aside
Small Business Set Aside - Total
Posted
November 5, 2026
Solicitation number
6982AF27B000002
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Construction in Arizona

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement - October 2026 Award-January - 2027 Construction - January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Browse more bids

More open bids from this agency

Similar open bids