Justification · N5523626R0009
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Department of the Navy · San Diego, CA
This is a notice (Justification), not a request for offers.
- Agency
- Department of the Navy FederalSouthwest Regional Maint Center
- Place
- San Diego, CA
- Offers due
- no due date given
- Estimated value
- not stated
- Notice type
- Justification
- Category
- Vehicles and transport
- Product service code (PSC)
- 2815
- Posted
- November 4, 2026
- Solicitation number
- N5523626R0009
Opens the notice on SAM.gov, with its attachments and how to respond.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
Description
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Browse more bids
More open bids from this agency
- closes in 23 days
- closes in 16 days
- closes in 3 days
- closes in 2 days
- closes in 7 days
Similar open bids
- closes in 10 days
- closes in 23 days
- closes in 7 days
- closes in 7 days
- closes in 7 days
- closes in 40 days