Solicitation · N0010426QNF40
Electronic Componen
Department of the Navy · Mechanicsburg, PA
- Agency
- Department of the Navy FederalNAVSUP Weapon Systems Support Mech
- Place
- Mechanicsburg, PA
- Offers due
- November 30, 2026, 3:30 PM (ET) closes in 21 days
- Estimated value
- not stated
- Notice type
- Solicitation
- Category
- Other goods
- Product service code (PSC)
- 5998
- Posted
- September 29, 2026
- Solicitation number
- N0010426QNF40
Opens the notice on SAM.gov, with its attachments and how to respond.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
Description
CONTACT INFORMATION|4|N744.11|BL5|[phone removed]|[email removed]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|NA|TBD|N00104|TBD|TBD|See Schedule|TBD|NA|NA|TBD|||||| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|$26,000.00| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|POC on Page 1| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(JUL 2026))|2||| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 Days ARO| OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)|1|365 Days ARO| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This solicitation is for the repair of 2 each of NSN 5998 015620705 IAW Reference number N124761. Replacement or new procurement will not be considered. The Government does not own the drawings or data rights to this NSN. 2. Government-Source Inspection and Acceptance (G-S I&A) is required. If the G-S I&A will occur at a different CAGE from the Admin Award CAGE, please provide the repair facility CAGE and/or packaging CAGE with the quote. 3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms ofthe contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. a. Requested RTAT: 331 Days b. Proposals shall reference the proposed RTAT and any capacity constraints. 4. Please provide the following information in the repair quote: a. Your CAGE (used as the awardee CAGE):___________________ b. the unit repair price: $____________________________________ and whether this price is firm-fixed price (FFP)_____; or estimated______ c. Beyond Repair (BR) Price $____________. d. Repair turn-around (number of days from receipt of asset(s) to shipment of repaired asset(s):_______days e. Throughput Constraint: _____/month. Refers to the total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflectsno throughput constraint. f. The new procurement cost of this NSN (if known): $________________________ g. Is this item (NSN) OBSOLETE: YES____ or NO _____ h. The repair CAGE _____________ and packaging CAGE___________. 5. Teardown and evaluation only quotes will NOT be accepted. 6. If this order is issued under and pursuant to the provision of the Basic Ordering Agreement (BOA), the terms and conditions of the Agreement are hereby incorporated by reference and, except as provided herein by this order, remain in full force and effect. If any conflict arises in the terms of this order versus the terms in the BOA, the terms of the BOA shall apply. 7. Induction Expiration Date: 365 days after the date of subsequent award. Anyasset received after this date in days is not authorized to be repaired without bi-lateral agreement between the vendor and Contracting Officer. 8. If Firm-Fixed Repair Pricing is provided, Beyond Economical Repair (BER) does not exist. With DCMA concurrence, Beyond Repair (BR) is possible. If the unit is determined BR, the contract will be definitized at the agreed upon BR unit price. 9. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications)related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 10. The Government retains the option to order an additional quantity up to 100% of this order for 365 days ARO at the same price. The Government may choose to exercise this option or not. 11. Please submit a repair quote to Rachel Kern via email: [email removed] This is the only submission method authorized. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ELECTRONIC COMPONEN . 1.1.1 ;NOTE: THIS ITEM IS TERMINAL, ACQUISITION ADVICE CODE (AAC)-V. IF DETERMINED BEYOND REPAIR AND DECLARED CONDITION CODE-H (UNSERVICEABLE/CONDEMNED) VIA CONTRACT MODIFICATION BY THE PROCURING CONTRACTING OFFICER (PCO), THE CONTRACTOR IS HEREBY AUTHORIZED TO "ABANDON-IN-PLACE" AND RETAIN ALL PIECE PARTS OF THIS ITEM FOR REUTILIZATION. ; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-129 | | |P |041029|A| |03| DOCUMENT REF DATA=MIL-STD-130 | | |M |051202|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ELECTRONIC COMPONEN repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;52088 N124761; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART ...
Browse more bids
More open bids from this agency
- closes in 23 days
- closes in 16 days
- closes in 3 days
- closes in 2 days
- closes in 7 days
Similar open bids
- closes in 36 days
- closes in 36 days
- closes in 38 days
- closes in 14 days
- closes in 25 days
- closes in 28 days
- closes in 7 days
- closes in 28 days
- closes tomorrow
- closes tomorrow