Solicitation · SPRMM127QGA26
Circuit Card Assemb
Defense Logistics Agency · Mechanicsburg, PA
- Agency
- Defense Logistics Agency FederalSPRMM1 DLA Mechanicsburg
- Place
- Mechanicsburg, PA
- Offers due
- November 30, 2026, 3:30 PM (ET) closes in 21 days
- Estimated value
- not stated
- Notice type
- Solicitation
- Category
- Other goods
- Product service code (PSC)
- 5998
- Posted
- October 29, 2026
- Solicitation number
- SPRMM127QGA26
Opens the notice on SAM.gov, with its attachments and how to respond.
Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|334412|750||||||||||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|x|x|x|||x|||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| This procurement requires Higher Level Inspection. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per clause WSSTERMMZ04 - Evaluation for Award (Lowest PricedTechnically Acceptable). 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are/are not available for this item. (Ifdrawings are available, include remark under "For Drawings")3. Delivery days_________aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is ?Commercial and Government Entity Code (CAGE) code? and the part number you are offering. IF PROPOSING AS A DISTRIBUTOR OR DEALER TO THE OEM, PLEASE TAKE NOTE TO THE TRACEABILITY REQUIREMENTS CITED IN CLAUSES DLATERMHZ01 IN THE SOLICITATION. REFURBISHED MATERIAL IS NOT ACCEPTABLE. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at [email removed]. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than That named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four Elements are met. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=ANSI/J-STD-001 | | |B |960801|A| | | DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;0KPC5 C97150-1C 0KPC5 C97150-1; 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Interchangeability - Interchangeability of parts, subassemblies, and assemblies shall conform to the following criteria: Design tolerances - Design tolerances shall permit parts, subassemblies and assemblies to be used in their parent assemblies without regard to the source of supply or manufacturer. Parts, subassemblies and assemblies having the full range of dimensions and characteristics permitted by the specification governing the part, subassembly or assembly shall be usable as replacement items without selection and without departure from the specified performance guidelines of the parent items. Parts and materials - When permission is granted to use a nonstandard part or material because the exiting standard part or material is not available, the equipment shall be so designed that the nonstandard part or material and the standard part or material are interchangeable. When the specification for the part or material contains substitutability or supersession information, the design shall permit the substitute or superceding parts or materials to be used interchangeably. 3.4 Workmanship - Workmanship for electronic equipment shall conform to the following criteria: Cleaning - After fabrication, parts and assemblied equipment shall be cleaned of smudges, loose, spattered, or excess solder, weld metal, metal chips and mold release agents, or any other foreign material which might detract from the intended operation, function, or appearance of the equipment. ...
Browse more bids
More open bids from this agency
- closes in 10 days
- closes in 10 days
- closes in 14 days
- closes in 10 days
- closes in 14 days
Similar open bids
- closes in 36 days
- closes in 36 days
- closes in 38 days
- closes in 14 days
- closes in 25 days
- closes in 28 days
- closes in 7 days
- closes in 28 days
- closes tomorrow
- closes tomorrow