BIDFINDER

Solicitation · RFP-383167-CD

Kautz Road Substation Construcion, UIP Subproject 2- KRS

Department of Energy · Batavia, IL

Agency
Department of Energy FederalFermilab - DOE Contractor
Place
Batavia, IL
Offers due
December 18, 2026, 5:00 PM (ET) closes in 39 days
Estimated value
not stated
Notice type
Solicitation
Category
Maintenance and repair
NAICS code
237130 Power and Communication Line and Related Structures Construction
Product service code (PSC)
Z2MZ
Posted
November 2, 2026
Solicitation number
RFP-383167-CD
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Maintenance and repair in Illinois

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab's mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab's accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 - 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 - 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin. Milestone 3 - 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward). Milestone 4 - 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed.. Milestone 5 - 30th September 2029; This milestone marks the completion of the project.

Browse more bids

More open bids from this agency

Similar open bids