Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Department of Energy · Batavia, IL

Agency
Department of Energy FederalFermilab - DOE Contractor
Place
Batavia, IL
Offers due
November 17, 2026, 5:00 PM (ET) closes in 8 days
Estimated value
not stated
Notice type
Solicitation
Category
Maintenance and repair
NAICS code
236210 Industrial Building Construction
Product service code (PSC)
Z2EZ
Posted
October 6, 2026
Solicitation number
RFP-376508-CD
Open the official notice

Opens the notice on SAM.gov, with its attachments and how to respond.

New bids by email: Maintenance and repair in Illinois

At most one email a day, only when there are new bids. You confirm by email and can unsubscribe in one click. Privacy

Source: SAM.gov Contract Opportunities, the U.S. government's official list of federal contract opportunities.

Description

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab's mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab's accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 - Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 - 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 - 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 - 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 - 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.